Woodbridge Crossing Mall - Retail Re-Development 

Location: Woodbridge, NJ 

Size: 260,000 SF Retail Center 

Work Completed: Construction & Project Management

Admin/Design/Zoning Scope: Work with Architect to finalize drawing set for construction and zoning approvals for renovations and improvements to building for modernizations, capital improvements, and Tenant Fit Outs.

Tenant Fit Outs: K&G Superstore, Kids Empire, Golftec, Phoenix Salons, U-Ship, Sandbox VR, Peach & Pebbles 
Construction Scope: Installation of new interior Tenant Fit Outs for newly acquired tenants at retail center, which required new layout/demising walls, utility divisions for electrical/gas meters, new HVAC systems, and General Site Improvements. 






144 East 44th Street - Office Re-Development 

Location: 144 East 44th Street, New York, NY

Size: 60,000 SF Office Building  

Work Completed: Construction, Project Management, Property Management, and Leasing 

Admin/Design/Zoning Scope: Work with Architect to finalize drawing set for construction and zoning approvals for renovations and improvements to building for modernizations, capital improvements, and Tenant Fit Outs.

Tenant Fit Outs: WDF Inc, Synexus Clinical Research, Touton SA, Human Edge, Pi Capital, Mager & Gougleman, Ricoh Technologies
Construction Scope: Installation of new interior Tenant Fit Outs for newly acquired tenants at office, which required new layout/demising walls and finishes, utility divisions for electrical/gas meters, new HVAC systems through building, and General Site Improvements to all common areas and exteriors. 






73 West 126th Street - Luxury Multi Family Development

Location: 73 W 126th Street, New York, NY 10027 

Size: 18,000 SF, 8 Apartment units

Services: Construction, Project Management, Property Management & Leasing 

Admin/Design/Zoning Scope: Work with Architect to finalize drawing set for construction and zoning. Obtain all zoning and permit approvals, management and perform all required inspections for occupancy of new building.  

Construction Scope: Demolition & Removal of two existing buildings in serious disrepair and structural instability which required structural shoring between adjacent lots with steel beam and underpinning of adjacent lot foundations. Excavation and installation of new concrete and rebar foundation systems for a cantilevered slab. Installation of new Utilities; Water, Fire Sprinkler, Gas, Electrical.  Construction of new building using heavy gauge metal framing systems and required interior and exterior finishes. Installation of new MEP systems throughout building. 





6-10 Bell Ave., Somerville, NJ - Warehouse/Industrial

Location: 6-10 Bell Ave. Somerville, NJ 

Size: 40,000 SF

Services: Construction, Project Management, Property Management  

Admin/Design/Zoning Scope: Work with Architect to finalize drawing set for construction and zoning. Obtain all zoning and permit approvals, management and perform all required inspections for occupancy of new building.  

Construction Scope: Environmental cleanup of hazardous/contaminated soils under slab required slab cut, structural shoring, excavation/removal of hazardous soils, installation of monitoring wells, and backfill. Removal of all asbestos and interior hazardous items. Removal of all former Tenant’s machinery, equipment, and fixtures. Repair and Installation of new structural joists damaged throughout premises which required shoring and direct replacement of structural joists. Repair and modernization of all HVAC, Electrical, Plumbing, and Ventilation Systems. Tenant fit out and general site upgrades and improvements. 





Lookout Ridge Housing Development

Location: Sandwich, MA

Size: 50 Acres, 28 Homes, Ground Up Development 

Work Completed: Design/Compliance, Construction, Property Management, Sale

Admin/Design/Zoning Scope: Work with Architect to finalize drawing set for construction and zoning approvals for 2 Subdivisions. Obtain all zoning and permit approvals with local township in coordination with architects, engineers, and attorney. Admin. Management and performance all required inspections for occupancy of new building.  
Construction Scope: Site Work which included the installation of new roads, drainage, and grading required for two new cul-de-sacs in separate locations on site.  Installation of new utilities serving the development which included Electrical, Septic Systems, Well Systems, and Propane Gas. Installation of site improvements such as entrance gates and landscaping systems. Construction and Development of single family homes on site. 






5 Wood Hollow - Office Building Re-Development 

Location: Parsippany, NJ 

Size: 300,000 SF Office Building / Complex 

Work Completed: Construction & Project Management

Admin/Design/Zoning Scope: Work with Architect to finalize drawing set for construction and zoning approvals for renovations and improvements to building for modernizations, capital improvements, and Tenant Fit Outs.
Construction Scope: Installation & Modernization of following common areas: Building Lobby, Courtyards/Exterior, Cafeteria, Conference Rooms, Bathrooms, Hallways and Corridors. Installation of new Office Spaces for Tenant Fit Outs for newly acquired occupants at building. 






67 West 126th Street - Micro Unit Development

Location: 67 W 126th Street, New York, NY 10027 

Size: 4,000 SF, 8 units

Scope: New Construction Group Up Development 

Work Completed: Design, Construction, Property Management, Leasing 





643 RT 211 E - Retail/ Office Re-Development 

Location: 643 Rt 211 E., Middletown, NY, 10940

Size: 20,000 SF Office Building  

Work Completed: Construction, Project Management, Property Management, and Leasing 

Admin/Design/Zoning Scope: Work with Architect to finalize drawing set for construction and zoning approvals for renovations and improvements to building for modernizations, capital improvements, and Tenant Fit Outs.

Tenant Fit Outs: Catskill Hudson Bank, IMA Medical Group, Michels Corp. 
Construction Scope: Installation of new interior Tenant Fit Outs for newly acquired tenants at office, which required new layout/demising walls and finishes, utility divisions for electrical/gas meters, new HVAC systems through building, and General Site Improvements to all common areas and exteriors. 






CONSTRUCTION & REAL ESTATE SERVICES